Projects |
| Project name |
Lebanon mine land clearing |
| Client |
|
| Supervisor |
|
| Objective |
Clearing mine fields in south of lebanon |
| Area |
|
| Clearance type |
- Visual
- Shallow
- Deep
- Mine field
|
| Applied equipment |
MINEX- Magnex120-DGPS-Data Logger-UPEX740-EPAD |
| Duration |
2014 |
 |
|

|
|
|
| Project name |
West Karoon |
| Client |
PEDEC |
| Supervisor |
|
| Objective |
Clearing mine field of power house electricity transmission path |
| Area |
|
| Clearance type |
- Visual
- Shallow
- Deep
- Mine field
|
| Applied equipment |
MINEX- Magnex120-DGPS-Data Logger-UPEX740-EPAD |
| Duration |
2015 |
 |
|

|
 |
 |
 |
| Using state of the arts technologies for data collection and data analysis |
Using 6 probe array data collection for deep search |
Intrusive search in one of the Yadavaran oil field well heads |
|
| Project name |
Yadavaran Oil Field Clearance VerificationProject |
| Client |
SINOPEC |
| Supervisor |
CSG |
| Objective |
Verification of cleared areas in yadavaran oil field |
| Area |
2500 hectares |
| Clearance type |
- Shallow verification
- Deep verification
- Intrusive search
|
| Applied equipment |
MINEX- Magnex120-DGPS-Data Logger-UPEX740-EPAD |
| Duration |
2009-2010 |
 |
|

|
 |
 |
 |
| Using state of the arts technologies for data collection and data analysis |
Using 6 probe array data collection for deep search |
Intrusive search in one of the Yadavaran oil field well heads |
|
| Project name |
Chazzabeh region demining project |
| Client |
IRMAC |
| Supervisor |
OICE |
| Objective |
Releasing mine affect area |
| Area |
300 hectares |
| Clearance type |
- Manual demining
- Mechanical verification
|
| Eequipment |
MINEX-DGPS-PPE |
| Duration |
2011(On going) |
 |
|

|
|
|
| Project name |
Changooleh region demining project |
| Client |
PEDEC |
| Supervisor |
|
| Objective |
Clearing mine land area of Changooleh oil field |
| Area |
3200 hectares |
| Clearance type |
- Manual demining
- Mechanical
- Visual
|
| Eequipment |
MINEX-DGPS-PPE |
| Duration |
2009 |
 |
|

|
|
|
| Project name |
Dehloran oil field seismography |
| Client |
Iran central zones oil |
| Supervisor |
Ground force of islamic republic of iran guard corps (NZSA) |
| Objective |
Clearing dehloran zone seismology lines |
| Area |
2200 hectares |
| Clearance type |
-
Eye search
-
Shallow search (60 cm)
-
Deep search (6 m)
-
Clearing minefields
- Demolition of detected ammunitions
|
| Applied equipment |
GPS- FREX- MINEX- DATA LOGGER- LOCATOR- UPEX740-TANK T62 |
| Duration |
June 19, 2008 |
 |
|
 |
| Unexploded cluster bomb in the project zone |
 |
| Intact minefield located at Dehloran oilfield |
 |
| A view of Dehloran oilfield |
|
| Project name |
Khorramshahr power plant |
| Client |
Saba power & electricity industries Co. |
| Supervisor |
|
| Objective |
Clearing mine land area corresponding to attached map
|
| Area |
130 hectares |
| Clearance type |
-
Visual search
-
Shallow search (60 cm)
-
Deep search (6 m)
-
Minefields
|
| Applied equipment |
MINEX- UPEX740- DATA LOGGER- FREX- GPS- DGPS |
| Mechanical equipment |
Bulldozer- loader- grader- excavator- back hole shovel |
| Duration |
2007 |
 |
|
|
| Project name |
South Azadegan |
| Client |
Petroleum engineering and development company |
| Supervisor |
Iran army |
| Objective |
Clearing the south of Dasht Azadegan, phase (II)
|
| Area |
1200 hectares |
| Clearance type |
-
Visual search
-
Shallow search (60 cm)
-
Deep search (6 m)
-
Minefields
-
Extermination by tank
|
| Applied equipment |
Tank T62- MINEX- UPEX740- DATA LOGGER- FREX- GPS- DGPS |
| Mechanical equipment |
Bulldozer- loader- grader- excavator- back hole shovel |
| Duration |
June 12, 2007 |
 |
|
 |
| Semi deep clearing by loop 740 set |
 |
| Valmera minefield (Talaiyeh District)
|
 |
| Sweeping detected mines and ammunitions (Talaiyeh) |
|
| Project name |
North Azadegan |
| Client |
Petroleum engineering and development company |
| Supervisor |
Iran army |
| Objective |
Clearing the north of Azadegan oil field, 1st phase
|
| Area |
750 hectares |
| Clearance type |
-
Visual search
-
Shallow search (60 cm)
-
Deep search (6 m)
-
Minefields
|
| Applied equipment |
Tank T62- MINEX- UPEX740- DATA LOGGER- FREX- GPS- DGPS |
| Mechanical equipment |
Bulldozer- loader- grader- excavator- back hole shovel |
| Duration |
2005 |
 |
|
|
| Project name |
Al-hareseh (Transmission of electricity line to Basra Province- Iraq) |
| Client |
Electricity development organization of iran and ministry of energy of iraq |
| Supervisor |
Moshanir company (Mine clearing center of iraq) |
| Objective |
Shallow and deep search and clearing minefield located at
the route of Shalamcheh-to- Hareseh border
|
| Area |
110 hectares |
| Clearance type |
-
Visual search
-
Shallow search (60 cm)
-
Deep search (6 m)
-
Minefields
|
| Applied equipment |
MINEX- UPEX740- DATA LOGGER- FREX- GPS |
| Mechanical equipment |
Bulldozer- loader- grader- excavator |
| Duration |
Apr. 14, 2007 |
 |
|
 |
| Deep clearing by FREX |
 |
| Valmera minefield in Iraq's land |
 |
| Deactivating and sweeping types of detected mine and ammunitions and transferring them to secure district |
|
| Project name |
Esmailieh |
| Client |
Mine clearing center of ministry of defense and logistics of armed force |
| Supervisor |
Moshaver omran iran company |
| Objective |
Clearing villages of page 1, 2 and koushk district
|
| Area |
7700 hectares |
| Clearance type |
-
Visual search
-
Shallow search (60 cm)
-
Minefields
- Mine extermination of district, sweeping and demolition of founded ammunitions
|
| Applied equipment |
Taftan mine exterminator, mine exterminating tank T62- GPS- Date Logger- MINEX |
| Mechanical equipment |
Bulldozer- loader- grader |
| Duration |
Mar. 15, 2004 |
 |
|
 |
| Taftan(Flail) set and executive personnel of the company |
 |
| Preparing district (plants pruning) |
 |
| Searching, detecting and deactivating mine M19 |
|
| Project name |
Tange- Hamam |
| Client |
|
| Supervisor |
|
| Objective |
Clearing mine field of Tange hamam region |
| Area |
|
| Clearance type |
- Visual
- Shallow
- Deep
- Mine field
|
| Applied equipment |
MINEX- Magnex120-DGPS-Data Logger-UPEX740-EPAD |
| Duration |
2015 |
 |
|

|
 |
 |
 |
| Using state of the arts technologies for data collection and data analysis |
Using 6 probe array data collection for deep search |
Intrusive search in one of the Yadavaran oil field well heads |
|
|
|
|
|
|
|
About us
|
Contact us
Tel: +98(21) 88 81 08 17-8
Fax: +98(21) 88 31 99 02
e-mail: Valizadeh110.ali@gmail.com
|
Projects
Iran:
Iraq:
Lebanon:
- Southern regions of lebanon
|
Gallery
|
Related websites
|
|
|
|
|
|
|
|
|
| |